Can I send a rough requirement before final drawings are ready?
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Share voltage, current, motor, encoder, protocol, board-envelope, and quantity-stage specs. We will respond with practical engineering and sourcing support.
Inquiry Email
Include voltage, current, motor, encoder, protocol, board envelope, and quantity stage.
RFQ Form
Use the form for quick routing, or email directly when drawings, attachments, or CC recipients are required.
| Required Item | Example | Why It Helps |
|---|---|---|
| Electrical window | 24V/36V/48V/60V bus, continuous current, peak current | Narrows viable GaN drive power stage and protection range. |
| Motor and encoder | BLDC/PMSM/frameless, pole pairs, BiSS-C/SPI/ABI/Hall | Confirms commutation, FOC tuning, and feedback interface fit. |
| Protocol and control | EtherCAT, CAN FD, CANopen, torque/velocity/position mode | Aligns firmware, commissioning files, and diagnostics. |
| Board envelope | OD/ID, stack height, mounting holes, connector direction | Avoids joint-module interference and harness rework. |
| Quantity plan | Prototype, EVT/DVT/PVT, pilot batch, annual forecast | Improves lead-time and pricing accuracy. |
| Destination and terms | Country, documentation needs, requested ship date | Aligns packaging, documents, and shipping plan early. |
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Use a revision-controlled change request with effective lot and impact scope agreed by both teams.
Yes. Please list required document types in the RFQ stage so they are included in validation and delivery planning.
If your team needs a fast start, use this structure in the first email. It improves quote precision and reduces clarification cycles.
| Output | Purpose | Buyer Action |
|---|---|---|
| Model and architecture direction | Narrow viable drive architecture against voltage, current, motor, encoder, and board-envelope assumptions. | Confirm baseline model path before cost-detail discussion. |
| RFQ clarification list | Close data gaps that affect pricing and lead-time accuracy. | Return missing values and drawing references in one reply. |
| Validation recommendation | Define sample test scope and acceptance evidence for technical sign-off. | Align internal engineering and procurement gates before PO. |